Guide — Allocating Resources
Create a Resource Pool
- Open Fabrikam Resource Pools.
- Choose New and enter Code, Description (keep Active checked).
- Optionally fill Department, Region, Expertise for filtering.
- Set Default Daily Hours (e.g. 8), Capacity % (e.g. 100), Default Hourly Rate.
Assign Resources to the Pool
- Open the Pool card from the list.
- In Members, select New and pick Resource No.; Effective Date auto = today.
- Repeat for all resources to include in the pool.
Use a Pool on a Project or Task
- Open a Fabrikam Project or create a new one and set the Project Pool Code.
- In the Fabrikam Tasks subpage, optionally set a Pool Code per task to override the project pool.
- Open Fabrikam Resource Assignments to allocate resource lines; the system derives Hourly Rate and Est. Cost.
- If over-allocation errors occur, adjust Allocation % or dates as appropriate.
- Use Recalculate Availability on Pools to refresh allocation metrics.